Sunday, April 12, 2015

Cabin and Anchor Well...

Anchor Well...

The anchor well is located at the forepeak, between the stem and the first frame (#2). 

Horizontal windlass
So here's the thought process...  I'm standing on a bar stool sized piece of deck, slimy anchor rode in hand, co-pilot is easing the boat forward as I gather in the scope that is piling up in an open locker below me as I straddle the open pit.  This is precarious enough but we are now straight over the anchor and I attempt to break her free, all back, as if I am trying to take off my "tenny shoes" while still standing in them. 



I have a better solution but it'll cost a few bucks, an anchor windlass. This is basically a winch that mounts on the deck and feeds the anchor rode (line) and or chain trough a hole on deck (hawsehole) into a locker.  The Lewmar Profish is one option, kind of fits my boat's size bur is a.  The only problems are the amperage requirements which are steep and the cost.  I'll have to save my pennies to get this purchased but anchoring is a daily chore that can be made much more tolerable with the right equipment and I think in the boat's daily use it is money well spent. Especially in the use that I anticipate which is multi-day cruising. My son in law Adam made a suggestion that I look into a vertical windlass.  We were discussing it the last time he was here and said that they can be useful in docking when current or wind is pushing you off.  It was something they did in the CG and it sounds like a great idea and a solid suggestion when we are shorthanded.




Epoxied anchor well
So the anchor line needs a home.  Of course the anchor itself can't go through the hawsehole so to deal with that we will store it on a bow roller, ready to drop at a moment's notice.  The anchor locker was constructed out of marine ply and will be lined with Xynole fabric. heavy fillets on all seams and will have two drains at the bottom above waterline. Here is what it looks like so far.  The milky look is attributed to some white pigment I was experimenting with as an epoxy colorant.  





    
Cabin Construction...

To start this portion of the build let me first say that I jumped around a little in construction.  You will see portions of this build out of sequence, things constructed that haven't been covered but we are bringing all of this up to date.  I had taken a week off of work and was fortunate enough to be able to spend most of it working on the boat.  Now it's time to get this blog sync'd with construction.

Because the frames were not beveled and there was such a steep angled leaving a large gap between the hull side and the frame, we filled the gap with thickened epoxy and taped with 24oz biaxial cloth/mat on the worst joints.  probably not needed but gave piece of mind with only edge contact and fasteners.







Carling sprung in place
Coating all surfaces.  Undersides of panels are coated then
installed, wet side down.
Water tanks will be stored under the V-Berth along with the water heater at the forepeak right behind the anchor well; a 46 and 36.  Also the fresh water pump will be installed under the berth. To provide support for the tanks and the mattress deck we installed bulkheads separating them. The 1x2 mattress support is let into the plywood bulkheads and sprung to the frames.  The water tanks will be installed on level surfaces with cleats to hold them in place.  All surfaces were coated in un-thickened epoxy, both inside and out of areas that will be foam filled. At this point we were ready to start up with the cabin sides and  needed the carlings sprung in place to attach the tortured  ply in place for a smooth bend.  The 1x2 carlings were glued and screwed into pre-notched deck members that were part of the original frame build. Once accomplished we needed to mill the mahogany strips that will form part of the finished cabin interior.  This will be the part of the berth wall that follows the hull curvature that the perpendicular sides slightly overlap.  We milled these 1/2" x 2" and rounded over one side, the other lies flat against the frames.  Before attaching them we stapled (SS staples) landscape fabric over the area to contain the eventual foam pour and to create a black background if seen.
Oddly enough I failed to take any photos of the installation process but it was pretty straightforward with six strips on each side being sprung into place and countersink screwed at each frame location.
Starboard cabin side in place
Bead board liner attached.  You can just see the mahogany strips below.
From here we moved on to the actual cabin sides themselves.  1/2" marine ply is the material and must be bent into place. I will also line this with the same bead board material. Now, getting this in place was tough.  Real tough.  We screwed a cleat in place at the pilothouse front wall and secured that edge to that cleat.  Standing in the cabin we tried throwing a hip into the ply as it grabbed and held itself against the anchor well. That got it started but needed more.  We used some 6" timber screws (the kind used to secure landscape ties together) with a cleat to spread the force and jacked the ply in with an impact driver at frames #4 & #6.  Once in place the ply was permanently affixed to the carling every 4" with #8 screws.  The bead board was then cut and attached with glue and staples. Clamps were used to temporarily hold it in place. 



Cabin Deck...

Cabin Deck (1st layer of 3/8" Ply-bead) installed.
1-3/4" Mahogany beam (needs a bottom arc and hanging knees)
Will update with picture below...
The cabin deck was the next step and for this we start with bead board again, but first we installed a center support cabin beam with the proper arc struck on it, as well as, a support cleat with the same arc attached at the pilot house wall. Both of these are "show" pieces and are cut from mahogany stock. The deck itself will fall against the slanted windshield so needs to be scribed to the arc formed as the windshield falls back and the decking arcs down.  We did this by sliding the deck against the windshield as far it would go, centered halfway down the cabin running fore and aft and using a compass, marked the arc holding one side against the windshield and the pencil part of the compass on the deck.  Once cut it was put back in place and the panel was scribed along the outside dimensions of the cabin side and cut to final shape.  Thickened epoxy to peanut butter consistency and dropped into a disposable Wilton cake decorator bag (buy them by the tear away 50 pack at Wal-Mart) was spread along all edges and screwed down, wiping up all of the squeeze out.
By the way, we had already  installed the windshield panel prior so it was in place for the cabin roof to attach to.  At this point we will come back later and installed two 1/2" layers of polystyrene sheet insulation with a 1/4" marine ply layer. All layers epoxied in place. We will build up the outer inch and a half of the deck with solid plywood strips that will be rounded over. Pocket lights will be installed in the deck for interior lighting.  We have also decided that the mahogany beam needs a bottom arc and hanging knees to look right so we'll fix that and post an updated picture when finished.  Moving on to the sole (floor) of the pilot house and cockpit next.

The Cabin so far... we will have trim and molding added once the bead board is primed and painted gloss white.
We will also have to install plugs in the Mahogany strips.  There will be an access panel in the bulkhead wall to get to the anchor well in case of a tangle. There will also be inspection ports to get to hardware installed in the boat deck (cleats and railing) right above the mahogany.

                                                                                                    








Monday, April 6, 2015

Pilothouse


Clean hull ready for here own single bedroom apartment addition...
Starting the Pilothouse Structure...

Now that the Redwing is right side up, we are on to the construction of the pilothouse and begin to see Miss Addy take shape.
the hull had to be cleared of all bracing and 100's of screw tips ground down inside the boat.  A lot of the screws were long and fully penetrated past the parts they were joining.  I also had to trim the keel bolts that stuck up from below and smooth those out.  Now that the prep work was done it was time to cut some plywood!
Plywood clamped together, Marine Fir facing up.

The sides of the pilothouse are actually a laminate of two sheets of ply, 1 - 1/2" sheet of marine fir and 1 - 3/8" sheet of yellow pine bead board.  Laying out the plybead facing down I crossed the two sheets of marine fir, oriented 90 degrees to the underlying plybead.  I clamped the pieces around the edges and laid out full size patterns that I had plotted out to cut by.  It could have been laid out on the board easily since there isn't any complicated round bilge to cut to but this made it just a little easier to position the door and window cutouts without a lot of extra measuring.
The plotter was only 36" wide so we had to use match lines
to join them together.  Lead filled shot bags holding the
prints down... thanks Brad!
Finished Pilothouse Back Wall Bulkhead cut out and ready to glue up
A homemade saw guide and hole cutter started the door opening.
Note the bead board facing up
Now that the parts were cut, I used a copious amount of PL Premium adhesive to join them together along with 5/8" narrow crown staples.  This is all above the waterline and am basically just adding a decorative interior finish to the pilothouse anyway with the beadboard installation.  I could have constructed the pilothouse out of 1/2" and added the ply afterward but thought I would kill two birds with one sawcut.
A pair of finished cabin sides ready to install.
Assembly...

Station 16 Bulkhead
the assembly proved one important point that had nagged me since we laid out the stations and that was, "How square had we managed to keep it?"  The pilothouse sits between Stations 8 and 16.  My wife and I, diagonal measuring team from way back, pulled measurements from frame to frame and found a 1/16" difference.  the true test came when these walls went up...



First the back bulkhead...  It fit well and we secured it every 6" with 10 x 2" 316 stainless steel screws.


Then the front bulkhead, secured in the same manner at Station 8.  So far so good.
Front Wall and rear wall installed


Side walls in place.

We tied them together for now with 2-1/2" stainless pocket hole screws on 8" centers.  They will be epoxied and covered in glass when complete.  I ran out of time to cut the windshield and am glad I did.  I had originally designed a solid, one piece windshield.  I have since decided on a two piece split windshield.  Smaller glass and prettier I think.  At least more retro than the single piece windshield.
I am sitting in my living room getting ready to post this and have left it unpublished for weeks until the windshield is cut.  My plywood cut table is outside the shop and it has been extremely rainy in Georgia.  We are waterlogged this year, so I moved on to other things and just haven't got back to the last windshield panel.  Decided to go ahead and publish this to keep true to the actual sequence of events.  At some point you guys will see the panel magically appear, but for now, I will hit the "Publish" button and on we go!

UPDATE... 4/12/15
With quarter round installed
Notch to be filled
The windshield panel is in.
Using shop made 7/8" yellow pine quarter round, we epoxied a piece to the inside edge and attached the windshield to it. We then epoxied in the same size quarter round to the outside notch that formed the rounded windshield piller support. The overall effect is a nice clean rounded corner with plenty of extra support in a fairly small profile.
The windshield has a large area below the glass that the cabin deck will fall against.
 

Wednesday, March 18, 2015

FLIP IT!!!!

The Time has come...

Momentus occasion folks.  Talked and talked about this day forever.  Schemed and dreamed of apparatus and technique to get this #1400+ plywood and epoxy bowl flipped over.  Finally settled on building a cradle, lag bolted to the frame, carpet lined and will be left in place (bottom portion only) until shes rolled out for good.

Steps:

So here is how this post will go.  Mostly pictures with comments. Not much else. Its mostly action so a long, drawn out explanation makes little sense...


Here you see the cradle constructed out of a combination of 2" x 6" and 2" x 12" scrap lumber.  the 12" stuff is notched for the keel and the bottom, green 2" x 6" is bolted to the frame via a stub piece of  2" x 4" bolted to a frame (you will see better in last photo.  Jacks are being used to lift the boat off of the ladder frame underneath which must be wrecked out before turning.



Here is the opposite side with a large tie down ring bolted to the 2" x 6" and the hoist attached.

Can't see the chain hoist but it is hooked into a piece of chain looped around the truss above the hole that was bored into the ceiling.  We made new holes in the ceiling later.  Lots of ventilation now!


She's up and starting to slide a little to the right, like we want but needed help.  using a come along we winched the bottom toward the right and continued to lift straight up.  the chain hoists were slow which gave us a lot of control.

Another view of the same angle.  In this view you can see that the far upper right corner of the cradle has embedded itself in the ceiling.  sawzall came in handy to remove "offending corners".  The cradle ended up being trimmed back quite a bit.


My brother Joe sliding the boat with the help of the come along 
as we prepare to pull it over to its natural position

Here it is.  Its bottom to never see the sun again (we hope).  The process took us around 3 hours and could have gone faster but had to regroup a few times to figure out what to do next or how to address a problem or two (mainly ceiling height).  Time for construction again.

Tuesday, February 3, 2015

How about a little color?

Its time to do a little painting folks.  Tired of looking at a blotchy, splotchy, indistinguishable hulk?  Me too and we're going to take care of that right now...
A quick rundown on what types of paints are used, where they are used and why they are different.  First is the paint that sits at and below the waterline, the Bottom Paint.  This is a paint that must be able to sit for extended periods of time, submerged, in a marine environment subjected to lots of marine organisms that would just love to eat your pretty little boat hull.  Now, painting a hull with bottom paint isn't always a given.  Generally speaking, its a matter of the boat's intended purpose and one (such as this project) will spend most of its time on a trailer and really doesn't need the benefits (and some drawbacks) of the bottom paint.  Now that leads to the possible alternatives of bottom paint.  One of those being what we call Topside Paint.  This kind of paint is intended generally for the areas above the waterline.  It states right there in black and white not intended for "prolonged use below the waterline".  No one can tell me just what "prolonged" means so we were a little hesitant to use it on a boat that may see up to a week in the water.  So... what to do.  There is another alternative that get us by for now and can be painted later if need be and that is a graphite filled epoxy bottom.  Used typically on kayaks and smaller boats, I decided to give it a try.  Folks tout that it will create a slick-as-snot barrier to rocks and such but I sort of doubt this.  It does seem to be a little slicker than epoxy alone and more importantly leaves a nice black color, I mean jet black.  For my topside paint, I used a 2 part marine urethane paint made by System 3, called WR-LPU.  What's great about this paint is that it is a water based poly which I have used or years building furniture.  Standard respiration and water cleanup are big bonuses for a small shop that can't afford fresh air respiration.  So, on to the process...
Striking the Waterline...
So this waterline is basically the level line that the boat should sit at in the water, loaded..  The designed waterline is the unloaded line that the boat would theoretically sit at which was basically at the corner of the back or the boat and at the front as well.  My calculated Loaded Waterline is the green taped line in the picture to the left.  Its about 3" lower than the DWL.  I used a rotary laser level to establish this and marked the boat all around at that level.  By the way, I decided to try a new tape on the market.  Marketed as Frog Tape, it proved fantastic in both resistance to bleed through of paint and bleed under of paint.  I used both the yellow and green versions and both worked equally well.  There's not much beyond this to say, only that it was pretty easy to get it wavy if you aren't careful.
I found that it was easier to get a nice fair line if I pulled three to four feet at a time and keep that much out as I pulled, letting the tape "fall" in the correct spot.  Not too bad once you get the hang of it.

Graphite Bottom...
The bottom epoxy coating is pretty simple.  It is just a matter of  mixing around 2 teaspoons per ounce of graphite powder (available at epoxy supply houses) with the needed amount of epoxy and roll it on. Put graphite in a clean cup and pour the mixed epoxy in it.  Much easier to mix. The one thing you won't get is a particularly smooth finish and I didn't think it was any problem as this will spend its life resting on a trailer bunk or submerged. 









The bottom received a total of 3 coats and looked pretty decent, or so I thought until I sprayed topside paint and compared the two next to each other.  It definitely looked like a homogenous structure and we could really see a final product emerge.

Primer...

In keeping with the System 3 line of product I used their epoxy primer formulated  for the WR-LPU line of  topcoats and masked up the boat to protect the mahogany transom and the newly epoxied bottom. Craft paper for the back and painter's plastic film for the bottom. I masked off a 1" border on the transom to be painted in what would be a traditional plank-edge fashion; as if the boat were traditionally planked and the ends of the boards were visible to the viewer from the transom.





Here you see the primed boat, ready for its white Bootstripe coat and "striking off" of the Bootstripe itself.  This Bootstripe I speak of is a design element originally meant to separate the topside and bottom paint and adds a sleek look to the boat. 

Now the paint...

My brilliant idea was to paint the white bootstripe paint and the white stem letting the paint spray past the intended line.  What this did was show up as an irregular thick edge in the color coat and eventually required sanding to smooth down, but we'll cover that later...

Once again we used the rotary laser to strike the line and I somehow managed to catch it as it pulsed by.  One thing to note here is that the boat hull's angle changes the width to the human eye.  the more angular, the thinner it will look, the more vertical, the thicker it will look.  That's why you just can't pull a 2" wide piece of tape and have it look the same thickness along the hull.
With the white painted bootstripe and stem masked off, we got ready to spray the color and you folks already know its a very, very retro green (57 Chevy Surf Green or as close as I can get).  S3 doesn't stock the color but the good folks at Sherwin Williams was good enough to sell me the BASF pigment necessary to get close (12oz of Jargon Jade) and  it was a matter of trial and error to get the gallon of white pigmented to the point that we were happy.  Wife loves the color and it looks like something that you would find in the Gulf.
Before re-sand, dull reflection....
 Here's the "almost final" product.  I say this because when it was all said and done we sanded this all back and recoated it.  Now, I know that sounds crazy but the finish was orange peeled like crazy.  You can see a sheen but the surface was too rough and I'll explain why...


 This particular paint is very temperature and pressure sensitive.  My mistake was threefold...
1. Shop temp was too low (60's).
2. Gun tip was too small (should have been 1.8 not 1.3) and was having to spray at 40psi vs. the recommended 25 to 30psi.
3. Paint wasn't thin enough (20% and should have been more like 30% water added).

Not to mention that the bottom looked like crap and was too rough to live with.  So, we climbed back on the bottom and sanded what must be the nastiest epoxy finish to sand ever.  We looked like coal miners but the bottom was smooth.  As we sanded out the sides, we sanded through the sides in places using 220G and 320G paper.  More color, more taping and much better results...
Reflective after 2 clear coats

White Stem which I've been told isn't traditional but is flashy, hell I wore yellow parachute pants in high school and breakdanced for God's sake!

You can still see orange-peel but what a tough finish!  My experience with Waterborne is that once cured, it is much tougher than solvent based.




Tuesday, December 9, 2014

Glassing the Hull and Fairing - Part 2...

Draping the Fabric...


First layer - working our way aft
smoothing out wrinkles.
Here is where we ventured into uncharted waters... sort of.  We had never used Xynole fabric before but expected two things from all we had read:
One, it ate copious amounts of resin during wet out; and
Two, it would drape wonderfully over tight curves and irregular shapes.  Both proved true. The initial wet out used close to 6 gallons of resin (filling ate 2 to 3 more) and using soft drafting brushes it was easy to move the cloth into position and push into corners with a few caveats...
Figure 2 - completed fabric
 ready for epoxy

The problematic joint between keel and hull was tough to get flat and smooth.  It wanted to pull away from the joint and create an air pocket under the fillet.  We had draped the cloth up to the point you see in Figure 2.  We didn't realize this until we tried to wet it out.

We made a few decisions along the way.  The first was to allow the fabric to overlap at the chines.  The first layer was centered over the keel and overlaps at the back and front.  There is enough "cling" that allows the fabric to stay put with little to no securing along its length.  We secured the fabric with blue tape around the transom to keep it from sliding forward as we brushed and smoothed the cloth out.  It went quickly and within a few hours we were ready for epoxy.  We had a combination of squeegees and 1/4" nap rollers to spread. The temp had dropped being October and the shop temp was around 70.

Disaster strikes (learning event)...

We mixed around 24 oz of epoxy resin, divided it and took our stations. We had visions of us working opposite sides of the hull starting at the bow, working the bottom and progressing toward the sides.  The epoxy was thick and we poured it on and started trying to work it. It disappeared like we had just poured it in a sponge.The rollers we had at the ready just grabbed the fabric and pulled it up, distorting it. The squeegees did much the same and the fabric was hardly wetting out where double layered, just sort of floating.  We knew that this was not going to work.
We stopped, contained it as much as possible and left it.  The biggest mistake we made was not leaving ourselves enough time to do this.  We both had a 2 hour window and this was not going to happen.  We backed up and punted.

Tools for the job...
So, I needed to tackle a few issues.  One was the wet out of the doubled layers.  I could have backed
up and peeled off the side panels and wet out the bottom first.  We kind of messed ourselves up with a few square feet of hardened epoxy (24 oz) locking both pieces together and to the hull.  I have seen folks using laminating rollers and decided to order two 6" long x 1" diameter rollers.  They look like stacks of edge sharpened washers and spacers stacked on a paint roller frame.  The beauty of it is that you can put pressure on the fabric and mash it into the epoxy without having surface area that would lift the fabric back up.
Also, I needed to get the shop temp up.  The next time around I would have it around 80 which totally changed the wet out properties of the epoxy.  Viscosity was totally different.
I will also mention my hot knife cutter which was used to trim the fabric as we draped it the first time but also came in handy for cutting along the keel fillet, thereby, separating the keel drape from the hull bottom.  It worked good.  Xynole is a polyester fabric, not fiberglass, so it was possible to "hot knife" it instead of cutting with a razor.
The last piece of the puzzle was needing more help and my son in law Adam stepped up to help. Thank God!  Adam is active duty Coast Guard, home for a short while while we celebrated the birth of our second Granddaughter, Emma.  The Redwing will be named after our first Grand baby, Addy Beth, so I guess there is a second build in the future so older Sis can't rub baby Sis's face in it. Anyway, Adam has spent (as most do full time on any ship) his fair share of time painting (and mixing paint). He says the commercials say its all about diving out of helicopters to rescue floundering sailboats or chasing drugs dealers and terrorists from our shores, but its really mostly chipping, scraping and painting.  He had become a master of those skills whether he wanted to be or not. His help was crucial in a "wet out" this large and we owe him big time.  The batches were mixed in 2 qt quantities and he rolled them out over and over and over (and over). In between, he grabbed squeegees, rollers, whatever and helped move it around. I admired his extremely thorough mixing technique and have tried to duplicate it ever since.  My epoxy batches seem more consistent now anyway.

Wet Out...


Mahogany transom after epoxy seal coat
Wet out hull - 6 gallons later
This was much more straight forward once the missing pieces were plugged in.  Adam started mixing batches and we started pouring.  This time we paused after the pour.  We knew that we needed to wait and let the fabric soak through and get heavy as it penetrated the plywood underneath.  This was one mistake on the failed attempt and I had forgotten that you had to be patient and confident about the process. We had plenty of buckets and as we finished one we would turn it upside down to drain off.  Hot work in the Tyvek suits and respirators but it progressed.  The sides ended up being easier than the bottom.  The keel sides were the toughest at a 90 degree angle. The sides were just a matter of pouring along the chine and working it around with the squeegees.  It would seem to be running toward the edge but as the fabric soaked it up, it would slow to a crawl.  Easy.  Then rolled out the overlaps with the laminate rollers.
It took the three of us about 4 hours of solid mixing, pouring and working the epoxy in the cloth.  By
the time we got done it wasn't very stressful to make a pour down the sides and we kept working the doubled up layers.  We also laid a coat on the transom to be covered with clear finish in the end. We left it alone and called it a day.

Final Sanding and Fairing...
This took some time and honestly has been a learning experience in what we thought was going to be a pretty straight forward process from all we had read.  I'll explain...
Lots and lots of dust...
From what I understood, we would just roll an additional 3 coats on and sand down flat having built the surface up sufficiently not to get back into the cloth.  I had also read that sanding into the cloth was very difficult and would be a hard thing to do given its abrasion resistant qualities.  I agree with this to a point, but folks you can sand through an edge or corner in a second so be careful.  Using Ruel Parker's instruction in his Sharpie book on finishing an xynole covered boat, I used a 4-1/2" grinder and flap disk pad to grind the overlapping joint edges down.  This was very aggressive and would have been better off doing this with a belt sander.  It chewed through the fabric just fine without leaving the irregular dips along the fabric edges that the grinder did (careful here too, but don't waste your time RO sanding to level). I will say that the polyester was very nice when it came to the itchiness that sanding glass cloth causes.  Orbital sanding takes forever on hard cured epoxy and the temptation is to get on the sanders edge to "speed" things up a bit. This will only leave a wavy surface.

My recommendation on leveling is... use a belt sander (good technique) with 80 grit belt, then 60 grit RO then 80, then 150 grit. The 80 grit orbital didn't remove the 80 grit belt sander scratches but the 60 did a nice job of it. We did not use the belt sander on the sides once glassed.  Our overlap was primarily on the bottom where it should be. We rolled out two fill coats once the heavy leveling was done on the bottom, sanded with 80 grit to level bottom and sides as much as possible and then switched to a knife edge steel trowel (kind you use to work concrete) to skim coat the surface using US Composites Fairing Filler mix.  It is a proprietary blend of fillers and worked really well.  Use small batches (12oz at a time) because a little bit goes a long way.
Note the faired and sanded surface on right
and irregular rough surface on the left before skim coat of filler
At this point it was a lot of my Dad doing the heavy lifting on the sanding duties as my elbow was in a brace after having the triceps tendon reattached to the bone.  I did what I could left handed and he took ibuprofen.
After roughly 12 to 16 hours or more of sanding we are down to the final spot fill and touch up before priming.  The surface looks fair and flat but a coat of epoxy primer will tell on us.  That should come over Christmas week with me coming out of this brace and taking a week off work. It isn't shown here but we put one last fillet along the keel/hull joint.  It still needs to be touched up with 150 and I'll amend this page to reflect that before posting the "Paint Posting" so stand by.  Injury and all, I think we will get her flipped after New Year's!
Light band on bottom running under the sander's dust bag is the overlap of material.  the dark bands on
either side of it is the skim coat fairing filler that leveled up the thickness difference.


 Gratuitous Injury Update...

5 days after surgery
2-1/2 weeks later - healing like a young pup :)
Gray headed old dog that is!
A product of my wife constantly telling me to "Put that down" or "I'll get that you idot!"
It worked!